Privacy Fence Installation
This backyard privacy fence replaced an aging, leaning run with clean lines and solid coverage. Posts are set deep in concrete below frost depth — the single biggest factor in whether a Calgary fence is still straight after five winters.
Picket spacing, cap lines, and gate alignment all get checked before we call a fence done. A fence is the first thing visitors see from the alley; this one makes the right impression from every angle.
- Scope: Full fence line installation
- Material: Wood privacy fencing
- Timeline: 3–4 days